Wind Evaluation Team
PRIORITY ISSUES 06/29/05
ATC Brainstorming Work Group Documents
Recommendations to FERC (02-18-05)
Criteria to Select Paths (02-18-05)
Structural Organization to WorkPlan (02-18-05)
Other documents
Queuing practices and alternatives to link LSE resource plans and transmission planning (06-30-05)
Final RMATS Report (09-04) (see Appdx H on Regulatory & Operational Issues Work Group)
Thoughts on Approaches to Path Congestion Analysis (12-14-04)
Determination of ATC within the Western Interconnection (06-01-01)
Western Interconnection Transmission Path Flow Study (02-2003)
Outline for Proposed FERC Audits of Transmission Paths (12-10-04)
ATC Group Call Summary (01-04-05)
OATT Attachment-C Filings (12-04)
APPA White Paper Restructuring at Crossroads, see pg. 23 (12-04)
Transmission Capability Margins and their use in ATC Determination (06-99)
Available Transfer Capability Definitions and Determinations (06-96)
Home | What is WIEB | Reports and Comments | Links | Email
1515 Cleveland Place, Suite 200, Denver, Colorado 80202 Phone 303.573.8910 Fax 303.534.7309