1:00
p.m. Convene the Steering Committee
*Jeff
Burks, Chairman
1:15 p.m. Project management
*Role of the Steering Committee
*Project deliverables
1:45
p.m. “Vision Statement” and audience
for project
2:15
p.m. The nuts and bolts of SIPs: A tutorial
on development of SIPs
* SIP development process
** Development of baseline inventories
** Model assumptions
** EPA review process
3:15
p.m. Break
3:30
p.m. Regional haze SIPs
* Consistency of inventories and assumptions between criteria pollutant
SIPs and regional haze SIPs
* Regional haze baseline inventory
** WRAP baseline or state-by-state baseline inventories?
** Impact of EERE on the regional haze baseline inventory and work of the
AP2 Forum
How EERE has been incorporated in SIPs
* EPA guidance (including verification requirements)
* Examples from other states of what has been proposed and what EPA has
approved
5:00
p.m. Recess
8:00
a.m.
Continental breakfast
8:30
a.m.
Inclusion of EERE under regional haze SIPs
* Section 309 SIPs
* Section 308 SIPs
Any missed opportunities to utilize EERE to advance air quality goals?
10:00
a.m.
Review annotated outline of SIP guidebook
* Why incorporate EERE into SIPs (from Vision Statement)
* How to incorporate EERE into a 309 SIPs
** Meeting the EERE requirements in the rule
** Mechanisms for implementing EERE measures
* How to incorporate EERE into 308 SIPs
** Impact of EERE on the baseline inventory
** EERE as control measures (modeling and verification)
* Menu of potential EERE measures for inclusion in SIPs
** Identifying specific programs to incorporate in SIPs
**Identify types of EERE measures that have been given credit in SIPs
Policy recommendations for expanding the role of EERE in air quality in
the future
12:00
p.m.
Assignments and next steps
12:30
p.m.
Adjourn